Obsidian Energy Announces Operational Update with Strong Start to 2024 Capital Program
This is a paid press release. Contact the press release distributor directly with any inquiries.

Obsidian Energy Announces Operational Update with Strong Start to 2024 Capital Program

Trade OBE on Coinbase

• Latest Pembina four-well pad produced at peak rate of over 2,000 boe/d at top end of expectations
• Continued robust Viking performance with 2023 eight-well pad producing at rates over 1,300 boe/d
• Nampa Clearwater well producing at strong early rates with superior oil quality

Calgary, Alberta--(Newsfile Corp. - February 28, 2024) - OBSIDIAN ENERGY LTD. (TSX: OBE) (NYSE American: OBE) ("Obsidian Energy", the "Company", "we", "us" or "our") is pleased to provide an operational update on our first half 2024 capital program. Our program continued with development of our Willesden Green/Pembina (Cardium) assets and exploration/appraisal and development drilling in the Clearwater and Bluesky formations in Peace River. We also completed the optimization of our Viking wells that were drilled in late 2023, which showed strong production results. Development activity has increased current production to over 36,500 boe/d (based on field estimates); while cold weather in January impacted production, we are currently running slightly ahead of our planned production year-to-date with the resumption of normal operations and strong initial rates from wells onstream in February.

"We are extremely excited with the early results of our drilling in Nampa, which confirms our technical work," commented Stephen Loukas, Obsidian Energy's President and CEO. "Showing the best quality oil in our acreage to date, the subsurface team did an excellent job characterizing and predicting the potential of this area. We look forward to further delineating Nampa's significant inventory and production potential. In addition, the Pembina (Cardium) four-well 7-36 Pad achieved strong early initial production rates of over 2,000 boe/d. We believe that these results unlock significant potential for additional development in the area."

LIGHT OIL ASSETS (CARDIUM AND VIKING)

Obsidian Energy's light oil development is providing encouraging initial results as we optimize production from 2023 wells now onstream while advancing our 2024 development program to help maintain light oil production levels and fund our development program in Peace River. On balance, our Cardium program is meeting our expectations as the strong results in Pembina have been partially offset by some modest results at Willesden Green.

Pembina (Cardium)

The four (4.0 net) wells on the 7-36 Pad that were rig released in late 2023 and early 2024 are now onstream, adding low-decline production and strong returns to the Company. The results to date are especially promising with strong average initial production ("IP") 7-day rates of 417 boe/d (91 percent oil) per well and total peak pad production of over 2,000 boe/d (89 percent oil). Located in the middle of our Pembina acreage, our recent development provides strong drilling efficiencies and provides important data as we look to optimize future drilling locations in the area.