Ivanhoe Electric Provides Update on Activities at its Santa Cruz Copper Project in Arizona
This is a paid press release. Contact the press release distributor directly with any inquiries.

Ivanhoe Electric Provides Update on Activities at its Santa Cruz Copper Project in Arizona

Trade IE on Coinbase

37 Drill Holes Totaling 25,176 Meters of Development Drilling Completed Since Release of the September 2023 Initial Assessment

Ongoing Technical Work is Advancing to Support a Preliminary Feasibility Study Expected to be Completed by the End of Q2 2025

Recent Infill Drilling Has Delineated a High-Grade Oxide Copper Domain at Santa Cruz; Drill Hole SCC-125 Intersected 66 Meters at 2.85% Total Copper

14 Drill Holes Totaling 12,510 Meters of Exploration Drilling Completed in 2023

Recent Assays at Texaco Ridge Confirm Step-out Mineralization; Drill Hole SCC-122 Intersected 327 Meters Grading 0.81% Total Copper, Southwest of the Existing Texaco Mineral Resource

Recent Acquisition of Approximately 6,900 Acres of Exploration Permits Brings the Santa Cruz Project Mineral Rights to Over 18,700 Acres

PHOENIX, AZ / ACCESSWIRE / January 8, 2024 / Ivanhoe Electric Inc. (NYSE American:IE)(TSX:IE) Executive Chairman Robert Friedland and President and Chief Executive Officer Taylor Melvin are pleased to provide an update on ongoing infill and exploration drilling and technical work at the Santa Cruz Copper Project, located west of Casa Grande, Arizona.

Mr. Friedland commented: "Our extensive exploration and development drilling programs at the Santa Cruz Copper Project have yielded very strong results and continue to uncover the full potential of the project. By incorporating sustainable technologies and renewable energy into the upcoming Prefeasibility Study and leveraging cutting-edge underground material handling methods, we are advancing studies at Santa Cruz for a modern, high-grade, underground copper mine with very low projected carbon dioxide-equivalent emissions."

Mr. Melvin commented: "The fourth quarter of 2023 was an important time for the advancement of our Santa Cruz Copper Project in Arizona. We significantly increased our development drilling activity and received substantial assays from recent exploration drilling. In addition to raising our level of confidence in the Santa Cruz and East Ridge mineral resource estimates, recent infill drilling identified a large, high-grade oxide domain in the Santa Cruz deposit. This domain contains higher copper grades and is located in better quality ground conditions than previously modeled in our 2023 Initial Assessment. Our ongoing development drilling and test work will support the studies required for our Santa Cruz Prefeasibility Study, which we expect to complete before the end of Q2 2025. Beyond our development drilling at Santa Cruz and East Ridge, assays from recent step-out exploration at Texaco Ridge identified wide zones of primary sulfide mineralization that could provide future growth for our Santa Cruz Project. The combined success of our recent development and exploration drilling programs at Santa Cruz provides us with strong momentum as we enter 2024."